Wednesday, July 2, 2008

Plaster and Inspection

Done our inspection with Kevin from NHI, nothing major on the framing apart from small corrections that needed to be done. Kevin will be back next week to check the brickwork once it's finished, should be this friday. So far so good guys, Kevin was also impress with the progress so far with no major issues , Mr SS seemed to be on top of everything.

Plastering should be started as we speak, should roughly be finished next monday.....

Good...Good

Tuesday, July 1, 2008

Nearing Lock-Up

The building process seems to be running at full steam, we've got the house wrapped, solar panel for water heating is on, heating unit installed, electric cabling done, and we've got the brickies started early in the week. We're wrapped by the progress so far.....hopefully the builder can maintain this speed until the finish line.

We'll also have inspection done this thursday morning with Kevin from NHI, hope everything are OK so there will be no major disruption.

Yihaaaaa....









Solar panel for water heating unit



We've got showerbase



Insulation for the external walls


Electrical cables, gas pipe and water pipes


Our small bath tub



ducted heating unit

Friday, June 20, 2008

Yay...roof tiling is completed and the piping for gas and water are also in place..... We have bricks on site, just have to wait for the house to be wrapped with insulation and hopefully the brickies can start next weekSpaz

here are some photos as promised












water and gas outlet for the kitchen










From the back of the house



Brick colour: Malt from austral brick

Tuesday, June 17, 2008

Just a quick update, the roof tiles was delivered last week and they have finished putting up all the roof tile batten. Roof tiling should be started tomorrow and fingers crossed it will be finished by the end of the week...

We'll post photos as soon as the roof tiling are finished.

Sunday, June 8, 2008

We had a visit to the block on the weekend, after an overnight shower, the house looks as if it's been washed. Here are some photos; it seems that the framing is about 75% finished.

Back of the house




Study and bed#3



Bathroom of course



Front





Hallway from entrance



Master bed from the kitchen



view of the kitchen from rumpus

Friday, June 6, 2008

Framing in progress

Surprise surprise..... the framing has already started on thrusday, only 3 days after the slab been laid.... hopefully the slab has fully curedNot Sure I'm sure they know what they're doing, right??Brows

Also, site has been cleaned and pile of dirt distributed throughout the block.

If they keep on building at this pace, the house could be finished in 4-5 months time......but wait until those slow finishing work inside the house which usually takes the longest.

Tuesday, June 3, 2008

Wohooo we've got slab

The slab was poured on monday.... at last, after some delay due to bad weather.

... Tongue ohhhhh so cold


Finished concrete slab




Waffle pod laid on thursday last week: (pic from the back )


From the front, looking at the garage: