Done our inspection with Kevin from NHI, nothing major on the framing apart from small corrections that needed to be done. Kevin will be back next week to check the brickwork once it's finished, should be this friday. So far so good guys, Kevin was also impress with the progress so far with no major issues , Mr SS seemed to be on top of everything.
Plastering should be started as we speak, should roughly be finished next monday.....
Good...Good
Wednesday, July 2, 2008
Tuesday, July 1, 2008
Nearing Lock-Up
The building process seems to be running at full steam, we've got the house wrapped, solar panel for water heating is on, heating unit installed, electric cabling done, and we've got the brickies started early in the week. We're wrapped by the progress so far.....hopefully the builder can maintain this speed until the finish line.
We'll also have inspection done this thursday morning with Kevin from NHI, hope everything are OK so there will be no major disruption.


Solar panel for water heating unit

We've got showerbase

Insulation for the external walls
Electrical cables, gas pipe and water pipes

Our small bath tub

ducted heating unit
Friday, June 20, 2008
Yay...roof tiling is completed and the piping for gas and water are also in place..... We have bricks on site, just have to wait for the house to be wrapped with insulation and hopefully the brickies can start next week
here are some photos as promised




water and gas outlet for the kitchen




From the back of the house

Brick colour: Malt from austral brick
here are some photos as promised




water and gas outlet for the kitchen




From the back of the house

Brick colour: Malt from austral brick
Tuesday, June 17, 2008
Sunday, June 8, 2008
We had a visit to the block on the weekend, after an overnight shower, the house looks as if it's been washed. Here are some photos; it seems that the framing is about 75% finished.
Back of the house

Study and bed#3

Bathroom of course

Front


Hallway from entrance

Master bed from the kitchen

view of the kitchen from rumpus
Back of the house

Study and bed#3

Bathroom of course

Front


Hallway from entrance

Master bed from the kitchen

view of the kitchen from rumpus
Friday, June 6, 2008
Framing in progress
Surprise surprise..... the framing has already started on thrusday, only 3 days after the slab been laid.... hopefully the slab has fully cured
I'm sure they know what they're doing, right??
Also, site has been cleaned and pile of dirt distributed throughout the block.
If they keep on building at this pace, the house could be finished in 4-5 months time......but wait until those slow finishing work inside the house which usually takes the longest.
Also, site has been cleaned and pile of dirt distributed throughout the block.
If they keep on building at this pace, the house could be finished in 4-5 months time......but wait until those slow finishing work inside the house which usually takes the longest.
Tuesday, June 3, 2008
Wohooo we've got slab
The slab was poured on monday.... at last, after some delay due to bad weather.