Friday, June 20, 2008

Yay...roof tiling is completed and the piping for gas and water are also in place..... We have bricks on site, just have to wait for the house to be wrapped with insulation and hopefully the brickies can start next weekSpaz

here are some photos as promised












water and gas outlet for the kitchen










From the back of the house



Brick colour: Malt from austral brick

Tuesday, June 17, 2008

Just a quick update, the roof tiles was delivered last week and they have finished putting up all the roof tile batten. Roof tiling should be started tomorrow and fingers crossed it will be finished by the end of the week...

We'll post photos as soon as the roof tiling are finished.

Sunday, June 8, 2008

We had a visit to the block on the weekend, after an overnight shower, the house looks as if it's been washed. Here are some photos; it seems that the framing is about 75% finished.

Back of the house




Study and bed#3



Bathroom of course



Front





Hallway from entrance



Master bed from the kitchen



view of the kitchen from rumpus

Friday, June 6, 2008

Framing in progress

Surprise surprise..... the framing has already started on thrusday, only 3 days after the slab been laid.... hopefully the slab has fully curedNot Sure I'm sure they know what they're doing, right??Brows

Also, site has been cleaned and pile of dirt distributed throughout the block.

If they keep on building at this pace, the house could be finished in 4-5 months time......but wait until those slow finishing work inside the house which usually takes the longest.

Tuesday, June 3, 2008

Wohooo we've got slab

The slab was poured on monday.... at last, after some delay due to bad weather.

... Tongue ohhhhh so cold


Finished concrete slab




Waffle pod laid on thursday last week: (pic from the back )


From the front, looking at the garage: